Fitzroy Bridges
Infrastructure Delivery

The Fitzroy Bridges project is part of TMR’s ongoing commitment and program to replace timber bridges of poor condition, structural integrity, and condition to improve commuter safety along State-Controlled Roads.

This project included the replacement of three bridges:

– Leichhardt Highway Banana Creek Bridge Replacement

– Burnett Highway Callide Creek Bridge Widening

– Dawson Highway Roundstone Creek Bridge Replacement

 

The benefits of this program and the replacements of the timber bridges included

– Improved structural integrity of the bridges with new and wider concrete structures.

– Provide access for higher mass limit (HML) vehicles and improve freight connectivity.

– A fit-for-purpose structure to accommodate expected growth in freight traffic and support economic productivity.

– A consistent driving environment by matching the approach road height with the bridge height.

– Improved road geometry and alignment to current standards.

– Reduced bridge maintenance and limited additional closures and/or traffic restrictions.

– Improved flood immunity (fewer and less frequent road closures).

– A consistent driving environment by matching the approach road height with the bridge height works.

 

 

Location

Rockhampton

Client

DTMR Fitzroy

Sector

State Government

Expertise

Contract Administration and Verification Services

Contract Lead

Ben Harte

Project Duration

Mar 2021— Apr 2022

Status

Completed

Project Value

$19.6M

Completed

Status

$19,600,000

Project Value